When specifying a resin flooring surface for a new build or refurbishment project, multiple factors should be taken into consideration to ensure the floor has the right properties for the building and that it can be installed on schedule and within budget.
Facilities or project managers are often faced with the task of speeding up schedules and cutting downtime. To do this they might be tempted to delay replacing a failing floor or opt for lower quality flooring materials that won’t withstand the building’s working environment.
However fast track flooring solutions are available that provide a hard wearing, durable floor with a significantly accelerated resin curing speed.
Methyl Methacrylate (MMA) solutions contain a catalyst that drastically accelerates the speed of cure typically associated with laying seamless poured floors in-situ. This delivers a fully trafficable floor for operational activities or follow on building work only 1-2 hours after application.
Based on a modified acrylic resin formula, this material is ideal for old or new concrete as well as asphalt, tiles, metal or wood. This flexibility saves time, labour and money in refurbishments as it can be applied directly over the existing floor.
For more information on Flowcrete Australia’s Fast Track Flooring range Flowfast, visit http://www.flowcreteaustralia.com.au/our-products/product-ranges/flowfast-rapid-curing-mma/.